
GMS have completed the commissioning on the 2nd phase of Adelphi Wharf in Salford. Using Stabilised Hydrogen Peroxide – The water tanks have been cleaned and disinfected and the pipework from the tanks to the water systems in all the flats have been dosed and flushed out following a 24 hour dose time – Samples collected on completion for analysis of water quality.
For help with commissioning or water disinfection works – contact GMS to discuss your needs.
Leave a Reply
You must be logged in to post a comment.